Industrial
We devote our whole experience to support innovative cost-efficient solutions, which "dress" customer's requirements. Exceptional material base and qualified personnel are a sure recipe for a successful project.
Wastewater treatment plant Crivina
Location: Crivina
Developed Area: 5,000 sqm
Start Date: March 2005
Completion Date: Decembrie 2005
Details:
Trafficable rooftops supported by concrete structure with mineral wool and double layered, slate protected, bituminous membrane solution. Non trafficable rooftops: supported by trapezoidal metal sheet plating, medium profile, mineral wool and bituminous membrane; special insulations on the filters; joinery treatment; water drainage system.
Referrals: here
Transporturi Auto Tei
Location: Bucuresti
Developed Area: 1,600 sqm
Start Date: July 2006
Completion Date: March 2007
Details:
Two buildings: Auto technical inspection station and office building. Metal structure (station) embedded in the foundation, with "Maltese cross" section pillars, thick welded metal sheets, H section beams.
Referrals: here
Heidelberg Cement
Location: Fieni
Developed Area: 80m diameter, 52m height, 64000 cubic meters
Start Date: June 2008
Completion Date: April 2009
Details:
Clinker silo: 130,000 tone capacity, reinforced concrete foundations, metallic roof structure and industrial trapezoidal metal sheet cover.
Referrals: here
FEA
Location: Bucuresti
Developed Area: 12,500 sqm
Start Date: February 2006
Completion Date: October 2006
Details:
Offices and production area, in house design, metal structure, concrete platforms in collaborated plates, high profile trapezoidal metal sheet roofing system, mineral wool, bituminous membrane, deco façade with structured cassettes, customization and execution of metal structure, execution of foundation and fittings, industrial flooring and special resins, paint jobs, carpentry works, water drainage system, natural and artificial lighting system, hot gas release systems.
Referrals: here
Henkel
Location: Campia Turzii
Developed Area: 130,000 sqm
Start Date: February 2007
Completion Date: July 2007
Details:
Production plant: GF+2 with automatic and manual production line for dry adhesives. Office building: GF+1. Automatic and manual distribution lines for staple silos and storage warehouse for finished products.
Referrals: here
Saint Gobain
Location: Calarasi
Developed Area: 54,000 sqm
Start Date: August 2004
Completion Date: March 2007
Details:
Glass warehouse: metal structure; conveyor bridge systems; high profile, pleated, trapezoidal metal sheet roofing system; mineral wool and bituminous membrane; light façade with structured cassettes.
Sand warehouse: mixed structure, high profile, pleated, trapezoidal metal sheet roofing system; mineral wool and bituminous membrane; trestle Work Bridge for elevated conveyor belts; concrete silos with high profile, pleated, natural and artificial lighting system, hot gas release systems.
Administrative offices: mixed structure; green and trafficable roof tops; industrial façade with structured cassettes, mineral wool and decorative corrugated metal sheets, curtain walls and aluminium; covers, pump house and access towers made in industrial solutions of pre-painted metal sheets; Geberit type gravitational water drainage system; trapezoidal facade skylights, aluminium joinery, special design foundations in difficult terrain and supervision of execution; the whole execution part is considered special due to fittings and works done as high as 35m.
Referrals: here
Daewoo
Location: Mangalia
Developed Area: 5,000 sqm
Start Date: August 2007
Completion Date: November 2007
Details:
Setting for ship section storage: Structure: metallic structure: columns, beams, trusses, purlins, roof bracings, sandwich panels, EM works.
Referrals: here
Delphi
Location: Iasi
Developed Area: 37,000 sqm
Start Date: April 2008
Completion Date: under construction
Details:
Pumps and Diesel Injector Plant
Production plant: GF+1, with fitted production line for pumps and injectors for diesel engines
Office building: GF+1
Annexes: chemical warehouse, staple storage and finished products; concrete platforms and interior road system, parking lot for heavy machinery,
Structure: metal (production plant) and reinforced concrete (office building); light masonry. Infrastructure: precast concrete, 24x12 bay.
Referrals: here
Dacia-Renault
Location: Mioveni
Developed Area: 36,000 sqm
Start Date: June 2004
Completion Date: November 2004
Details:
Cover: corrugated metal sheets, mineral wool, bituminous insulation
Ventilated facades, smoke hatch, skylights, drainage systems
Referrals: here


